Unit 9 is accessed to the rear of the site and would be suitable for light manufacturing, storage and distribution. Access is via two electric roller shutter doors.
The unit has a concrete floor, partially under a pitched slate roof, and a new steel portal frame extension with profile steel cladding and translucent roof lights.