The building forms part of a scheme, which was developed in 2001 by Shipmead Propertiers and involved the creation of eight individual office buildings. The offices were converted to a good standard and are in the process of being refurbished. The specification includes sealed unit double glazed windows throughout, suspended ceilings with inset LED lighting, new carpeting throughout and a gas fired radiator central heating system. The offices are fully cabled, and a telephone system is available if required. There are both male and female and disabled WCs at intervals throughout the building and a kitchenette within the suite. Externally the building has been rendered and painted. The suite benefits from three onsite car parking spaces.