The property comprises a new build warehouse unit which is currently undergoing construction and due for completion in Autumn 2021.
The property will be a steel portal framed unit with part brick/blockwork elevations, part steel clad beneath a pitched steel sheet roof. The unit will have an eaves height of approx. 6.5m. There will be two roller shutter loading access doors. Water and electric services will be provided to the unit.
There will be a secure loading yard to the front of the unit.
There is the potential to take the unit as a whole or split into two units.
According to the architects plans provided on a gross internal basis the areas are as follows:-
Unit 1 Approx. 6,500 sq ft
Unit 2 Approx. 6,500 sq ft
Total Approx.13,000 sq ft