Terrace of 3 industrial/warehouse units constructed c. 1990.
Brick/block construction with a steel portal frame and equal pitched fully lined corrugated profile steel roof.
Each of the units has the following:
High level sodium lighting
Manual roller shutter loading doors
Pedestrian entrance to the warehouse areas and additional entrance to the first floor office accommodation
First floor office accommodation with air conditioning units
Inset ground floor staff area and toilet facilities
Overhead gas fired blower heaters (Units 2 & 3)
Single and 3 phase electricity
1,000kg SWL overhead crane (Unit 2)
Units 1 & 2 can be split into 2 separate units if required.
Eaves height: 5.56m (18'3'') rising to 6.58m (21'7'') at the apex.