The development was completed in 2016 and comprises a terrace of new industrial workshop units. Unit 7 benefits from a mezzanine floor with 5Kn loading capacity, 3 phase electricity supply, security alarm and a maximum eaves height of 6.8 m. The unit has 4 allocated parking spaces, and is served by a 3.55 m wide and 4.34 m high electronically operated loading door. The property also benefits from WC with hot and cold water, emergency lighting and a fire alarm and detection system. The estate is secured by communal electric security gate.