The development comprises a terrace of 7 starter units constructed by Bolsover District Council and completed in 2017. The specification of units comprises;
Steel frame construction; natural stone and composite clad elevations; 5.18m eaves height rising to 6.30m; sectional overhead doors (measuring 3.50 x 4.28m) and concrete floor slab with capability to accommodate point loading.
The industrial units are located within the Business Hub site, and as a result benefit from:
Concierge reception / meet-and-greet for visitors; meeting and conference facilities; well appointed car parking; CCTV site wide coverage and telephones and broadband.